Lincoln Ave and Jefferson Pump Station Upgrades Project

The existing sewer pump stations located at 21 Lincoln Ave and 1678 Main Street are being replaced with a new stations.  Each  station serves a very large area  of Holden.  The existing stations  are over fifty years old.  Lincoln Avenue Pump Station Work includes replacement of the existing extended-shaft vertical centrifugal pumps and motors with new dry pit submersible pumps, replacement of the associated equipment, piping and valves within the valve chamber, electrical upgrades for the new pumps and motors, control panel including two VFDs, and replacement of pump level control equipment and instrumentation.
Jefferson Pump Station: Replacement of the existing pumps and motors with dry pit submersible style pumps, replacement of the associated equipment, piping, and valves within the valve chamber, replacement of pump level control equipment and instrumentation, and electrical upgrades for the new pumps and motors, and control panel including two VFDs. The work also includes adding a cut-in valve outside the station for force main isolation. Masonry repairs to the building, including demolishing and repairing the two louvers.