Primary tabs
Title | Number | Start Date | End Date | Status |
---|---|---|---|---|
Bids for Application of Turf Field Treatments for Various Fields | DPW 21-1 | 03/17/2021 - 3:00pm | 04/02/2021 - 10:00am | |
Pavement Markings | DPW 21 - 6 | 05/05/2021 - 12:00am | 05/20/2021 - 10:00am | |
Hot Mix Asphalt, In Place | DPW 21 - 2 | 05/05/2021 - 12:00pm | 05/27/2021 - 10:00am | |
Asphalt Cold Planing | DPW 21 - 3 | 05/05/2021 - 12:00pm | 05/20/2021 - 10:00am | |
Microsurfacing | DPW 21 - 4 | 05/05/2021 - 12:00pm | 05/20/2021 - 10:00am | |
Polymer & Crumb Rubber Modified Asphalt Compound Crack Sealing | DPW 21 - 5 | 05/05/2021 - 12:00pm | 05/20/2021 - 10:00am | |
Dawson Pool Hot Water Heater Replacement | DPW 21 - 7 | 05/06/2021 - 3:00pm | 06/02/2021 - 11:00am | |
Precast Concrete Structures | DPW 21 - 8 | 05/14/2021 - 8:00am | 06/03/2021 - 10:00am | |
Bituminous Concrete, Cold Patch | DPW 21 - 9 | 05/14/2021 - 8:00am | 06/03/2021 - 10:00am | |
Washed Dry Winter Road Sand, Crushed Stone, Stone Sand, Dense Graded and Loam | DPW 21 - 10 | 05/14/2021 - 8:00am | 06/03/2021 - 10:00am | |
Potassium Hydroxide (Caustic Potash) | DPW 21 - 11 | 05/14/2021 - 8:00am | 06/03/2021 - 10:00am | |
Mayo Elementary School Building Automation System Upgrades | DPW 21 - 12 | 05/19/2021 - 6:00am | 06/16/2021 - 11:00am | |
Precast Concrete Structures: Manhole and Catch Basin, Adjusting Rings, Catch Basin, Double Catch Basins and Manhole Frames & Grates, Corrugated Polyethylene Tubing & Fittings | DPW 21 - 13 | 06/21/2021 - 9:45am | 07/08/2021 - 10:00am | |
Catch Basin Cleaning | DPW 21 - 14 | 06/23/2021 - 12:00pm | 07/08/2021 - 10:00am | |
Treated Sodium Chloride Road Salt | DPW 21-15 | 11/08/2021 - 10:00am | 11/24/2021 - 10:00am |